Overview and History

Overview and History

Overview

Whole plant

Address  

464 Kougawa, Shiraki-cho, Kameyama City, Mie Prefecture 519-0198, Japan

For details   Getting There
  Location
Site area  
Approx. 330,000 m2

Kameyama Plant No. 1

<Large LCD plant>
Total floor area  
Approx. 130,000 m²
Glass substrate size  
Sixth-generation: 1,500 x 1,800 mm (eight 32-inch panels or six 37-inch panels per substrate)
Substrate input  
60,000 panels per month
 
<Large LCD TV plant>
Total floor area  
Approx. 77,600 m²
Production items  
LCD TVs 26 inches or larger
Production capacity  
100,000 units per month
 
Start of construction 
September 2002
Start of operation  
January 2004

Kameyama Plant No. 2

Total floor area  
Approx. 279,100 m²
Glass substrate size  
Eighth-generation: 2,160 x 2,460 mm (eight 40-inch panels or six 50-inch panels per substrate)
Substrate input  
30,000 panels per month
 
Start of construction 
July 2005
Start of operation  
August 2006

History

February 2002   Photo:April 2002?
Announced the construction plan.

April 2002  
After the finalized location agreement was signed on April 17, started preparation of the land at the construction site.

September 2002   Photo:September 2002
Held a groundbreaking ceremony on September 10 while continuing the construction work that employed up to 4,000 workers per day.

January 2004   Photo:January 2004?
Completed construction of the plant building and relevant facilities and installed production equipment inside. Started operation in January 2004. (Made the first shipment of AQUOS LCD TVs on January 28).

April 2004   Photo:April 2004?
Held a construction completion ceremony for the Kameyama Plant on April 21, inviting about 90 people from government offices, local concerned entities, and construction companies.

August 2004  
In order to meet the growing demand for large LCD panels used in LCD TVs, introduced the second large LCD panel production line and started its operation in August.

July 2005  
Started construction of the second plant on the same plant site on July 1.

August 2006   Photo:August 2006?
Started the operation of Kameyama Plant No. 2.
January 2007  
Introduced second line at Kameyama Plant No. 2.

Topics

December 13, 2004 
The Kameyama Plant won the Grand Prize in the 1st Nikkei Monozukuri Awards. (Sponsored by Nihon Keizai Shimbun, Inc.; the awards ceremony was held on December 13)

June 10, 2005  Photo:June 10, 2005?
The Kameyama Plant won the Sustainable Management Pearl Award, in the environmental management section of the 3rd Japan Sustainable Management Awards. (Sponsored by the Japan Sustainable Management Awards Committee and Mie Prefecture; the awards ceremony was held on June 10)

August 3, 2005 
Ten employees working at Kameyama Plant No. 1 won the Economy, Trade and Industry Minister´s Prize in the 1st Monozukuri Nippon Grand Award. (Sponsored by the Ministry of Economy, Trade and Industry and presented by the Prime Minister; the awards ceremony was held on August 3)

May 30, 2006  Photo:May 30, 2006
The Kameyama Plant won the Economy, Trade and Industry Minister´s Prize in the 8th Japan Water Award. (Sponsored by Japan Water Award Committee; the awards ceremony was held on May 30)


Top of Page
Kameyama Plant
 | Top | Concept | Kameyama Model | Kameyama Plant No. 1 | Kameyama Plant No. 2 | Creating the Massive Plant | 
 | Overview and History | Getting There | Location | 
 | Top | Kameyama Plant | Kameyama Manufacturing | Environmentally Conscious | Virtual Tour | 
  (c) 2006 SHARP CORPORATION